EFFECT OF IDOL IMMERSION IN THE RIVER GANGA : A CASE STUDY.

During the Puja festival in West Bengal, a huge number of idols are immersed in the river Ganga every year. The idols are painted with different metal based paints. On immersion of these idols in the river, the river water is contaminated with these metal paints and a change in chemical load in the river body is expected. With this objective in mind , like last year , the Board decided to monitor the effect of idol immersion in the river Ganga with respect to change in Chemical Oxygen Demand(COD) and metal contamination.

The monitoring was conducted in four phases between October 2001 and February 2002.

The first phase was conducted during immersion of Durga idols in the period between 26.10.2001 and 29.10.2001 at two spots in the river Ganga (a) Police Jetty near Babughat and (b) Shibpur Swasan Ghat . The second phase was conducted during immersion of Kali idols in the period between 16.11.2001 and 18.11.2001 from the same two spots.

To study the effect of idol immersion in confined water body, samples were collected from a pond adjacent to Subhasnagar Maidan, DumDum Cantonment. The fourth phase of the study was conducted at Ranighat, Chandannagar during immersion of Jagadhatri idols in the river Ganga during the period between 25.11.2001 and 26.11.2001.

In all the phases water samples were drawn from the spots in regular time intervals and were subsequently analysed for COD and metal contents .The results thus obtained were compared with those of the control which was collected from the same spots earlier and later. Besides the water samples, solid samples from river bank at these spots were also collected to study the metal deposition in them in comparison to control solid samples collected earlier and later from same spots. A part of idol was also collected to study the metal content in them.

Finally, water and soil samples were collected from the same spots after a couple of months and the river was almost free from idol immersion activities and studied for metal contamination or deposition if any.

The results thus obtained are tabulated below:

 

PHASE-I. STATION :I. POLICE JETTY NEAR BABUGHAT

TABLE-IA : Control Water Study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1A 25.9.2001 1.00PM BDL BDL BDL BDL BDL 0.081 0.103 12.00
2A 08.2.2002 12.30PM BDL BDL 0.022 BDL BDL 0.04 BDL 4.08

 

TABLE IB :Study of Water samples collected during immersion of Durga idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1A 26.10.2001 4.00PM BDL 0.024 BDL BDL 0.028 1.66 5.48 10.00
2A 26.10.2001 6.15PM BDL BDL BDL BDL BDL 0.18 0.014 10.00
3A 26.10.2001 8.00PM BDL BDL BDL BDL BDL 0.11 0.062 10.00
4A 26.10.2001 10.00PM BDL 0.024 BDL BDL BDL 0.17 0.046 20.00
5A 27.10.2001 12.00Hrs. BDL BDL 0.023 BDL BDL 0.20 0.01 20.00
6A 28.10.2001 4.00PM BDL BDL BDL BDL BDL 0.13 0.12 10.00
7A 28.10.2001 6.20PM BDL 0.02 BDL BDL 0.21 0.10 0.04 10.00
8A 28.10.2001 8.00PM BDL BDL BDL BDL BDL 0.09 0.04 10.00
9A 28.10.2001 10.30PM BDL BDL BDL BDL BDL 0.05 0.02 10.00
10A 29.10.2001 12.15AM BDL BDL BDL BDL BDL 0.13 0.044 10.00
11A 29.10.2001 2.00AM BDL BDL 0.844 BDL 0.024 1.02 3.48 10.00

 

TABLE IC : study of samples collected during immersion of Kali idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

12A 16.11.2001 4.00PM BDL BDL 0.05 0.004 BDL 0.04 BDL 2.00
13A 16.11.2001 6.30PM BDL BDL 0.056 BDL BDL 0.08 0.018 2.00
14A 16.11.2001 8.25PM BDL BDL 0.052 0.010 BDL 0.07 0.022 2.00
15A 16.11.2001 10.40PM BDL BDL 0.038 0.006 BDL 0.13 BDL 2.00
16A 17.11.2001 12.05AM BDL BDL 0.36 BDL BDL 0.04 BDL 2.00
17A 17.11.2001 4.00PM BDL BDL 0.034 BDL BDL 0.01 0.03 10.00
18A 17.11.2001 6.20PM BDL BDL 0.024 BDL BDL 0.01 0.008 2.00
19A 17.11.2001 8.00PM BDL BDL 0.024 0.003 BDL 0.05 0.024 4.00
20A 17.11.2001 10.00PM BDL BDL 0.048 0.004 BDL 0.02 0.034 2.00
21A 18.11.2001 12.20AM BDL BDL 0.04 BDL BDL 0.02 BDL 2.00

 

TABLE ID : CONTROL SOIL SAMPLE STUDY

 

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1A 25.09.2001 1.00PM BDL 0.014 BDL BDL 0.01 0.06 0.06
2A 08.02.2002 12.30PM BDL BDL 0.033 BDL 0.009 0.065 BDL

 

TABLE IE :SOIL SAMPLE STUDY DURING IMMERSION

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

4A 17.11.2001 11.30PM BDL 0.003 0.039 BDL 0.012 0.08 0.054
3A 18.11.2001 12.30AM BDL 0.003 0.035 BDL 0.024 0.25 0.043
1A 27.10.2001 12 hrs BDL 0.016 0.118 BDL 0.017 0.075 0.036
2A 28.10.2001 11.00PM BDL 0.036 0.046 BDL 0.63 0.12 0.03

 

TABLE IF : PART OF IDOL(SOLID SAMPLES)

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1A 17.11.2001 11.30PM BDL 2.25 0.045 BDL 0.016 0.09 14.80

 

PHASE :II STATION II : SHIBPUR SWASHAN GHAT

TABLE-II A : Control Water Study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1B 25.09.2001 12.30PM BDL BDL BDL BDL BDL 0.167 0.102 26.00
2B 08.02.2002 1.10PM BDL 0.124 0.024 BDL BDL 0.092 BDL 22.44

 

TABLE II B :Study of Water samples collected during immersion of Durga idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1B 26.10.2001 4.10 PM BDL BDL BDL 0.013 BDL 0.144 0.354 20.00
2B 26.10.2001 6.00PM BDL BDL BDL BDL BDL 0.054 0.064 10.00
3B 26.10.2001 8.15PM BDL BDL BDL BDL BDL 0.172 0.066 40.00
4B 26.10.2001 10.00PM BDL BDL BDL BDL BDL 0.100 0.108 10.00
5B 27.10.2001 12.20AM BDL BDL BDL BDL BDL 0.050 0.026 20.00
6B 28.10.2001 4.30PM BDL BDL 0.046 BDL BDL 0.24 0.038 10.00
7B 28.10.2001 6.00PM BDL BDL 0.010 BDL BDL 0.22 0.040 20.00
8B 28.10.2001 8.30PM BDL 0.02 BDL BDL 0.02 0.492 0.596 10.00
9B 28.10.2001 10.00PM BDL BDL BDL BDL 0.034 0.34 0.19 10.00
10B 28.10.2001 11.50PM BDL BDL 0.038 BDL BDL 0.11 0.18 10.00

 

TABLE 11C : Study of water samples collected during immersion of Kali idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

11B 16.11.2001 4.30.PM BDL BDL 0.034 BDL BDL BDL 0.01 2.00
12B 16.11.2001 6.00PM BDL 0.02 0.032 BDL BDL 0.05 0.05 9.68
13B 16.11.2001 8.00PM BDL BDL 0.058 BDL 0.08 0.15 0.04 10.00
14B 16.11.2001 10.00PM BDL BDL 0.038 BDL BDL 0.04 BDL 2.00
15B 17.11.2001 12.30AM BDL BDL 0.036 BDL BDL 0.04 0.016 8.00
16B 17.11.2001 4.20PM BDL BDL 0.044 BDL BDL 0.14 0.010 6.00
17B 17.11.2001 6.00PM BDL BDL 0.040 BDL BDL 0.10 0.020 22.00
18B 17.11.2001 8.20PM BDL BDL 0.048 BDL 0.001 0.11 0.026 16.00
19B 17.11.2001 10.20PM BDL BDL 0.032 BDL BDL 0.07 0.014 6.00
20B 18.11.2001 12.00Hrs BDL BDL 0.044 BDL BDL 0.34 BDL 10.00

 

TABLE 11D : Control Soil Sample study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1B 25.09.2001 12.30PM BDL 0.132 BDL BDL 0.01 0.071 0.060
2B 08.02.2002 1.10PM BDL 0.002 0.024 BDL 0.002 0.146 BDL

 

TABLE 11 E :Soil Sample Study during immersion

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

3B 27.10.2001 12.20AM BDL 0.029 0.030 0.002 0.028 0.093 0.017
4B 28.10.2001 10.00PM BDL BDL BDL BDL 0.030 0.104 0.024
5B 18.11.2001 12.30AM BDL 0.052 0.131 BDL 0.056 0.107 0.098
6B 18.11.2001 10.20PM BDL BDL 0.024 BDL 0.012 0.050 0.005

 

PHASE –III . STATION III : POND ADJACENT TO SUBHAS NAGAR MAIDAN, DUMDUM CANTONMENT

TABLE-III A : Control Water Study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1A 28.09.2001 7.00AM BDL BDL BDL BDL BDL 0.012 0.026 19.76

 

TABLE III B :Study of Water samples collected during immersion of Durga idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1A 27.10.2001 11.10PM BDL BDL BDL BDL BDL 0.22 0.066 10.00
2A 28.10.2001 10.00PM BDL BDL 0.008 BDL BDL 0.10 0.034 40.00

 

TABLE III C : CONTROL SOIL SAMPLE STUDY

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1A 28.09.2001 7.00AM BDL 0.02 BDL BDL 0.01 0.14 0.10

 

TABLE 11I D :Soil Sample Study during immersion

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

2 27.10.2001 11.15PM BDL 0.015 0.042 BDL 0.020 0.14 0.33
3 28.10.2001 10.15PM BDL 0.04 0.061 BDL 0.031 0.178 0.027

 

PHASE-IV. STATION :IV. RANIGHAT,CHANDANNAGAR

TABLE-IVA : Control Water Study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1 26.09.2001 8.30PM BDL BDL BDL BDL BDL 0.025 0.09 20.00
2 27.09.2001 8.20AM BDL BDL BDL BDL BDL 0.053 0.13 14.00
3 31.01.2002 4.35PM BDL BDL BDL BDL BDL BDL BDL 2.20
4 31.01.2002 9.45AM BDL BDL BDL BDL BDL BDL BDL 4.40

 

TABLE IV B :Study of Water samples collected during immersion of Jagadhatri idols

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/l

TOTAL Cr

mg/l

Cu

mg/l

Cd

mg/l

Ni

mg/l

Zn

mg/l

Pb

mg/l

COD

mg/l

1 25.11.2001 12 NOON BDL BDL 0.01 BDL BDL 0.028 BDL 9.80
2 25.11.2001 2.00PM BDL 0.01 0.024 BDL 0.004 0.07 BDL 9.80
3 25.11.2001 4.00PM BDL BDL 0.01 BDL BDL 0.022 BDL 3.92
4 25.11.2001 6.00PM BDL BDL 0.02 BDL BDL 0.04 0.052 3.92
5 25.11.2001 8.00PM BDL BDL 0.044 BDL BDL 0.124 0.38 3.92
6 25.11.2001 10.00PM BDL BDL BDL BDL BDL 0.022 0.044 3.92
7 26.11.2001 12.00Hrs BDL BDL 0.01 BDL BDL BDL 0.018 5.88
8 26.11.2001 2.00AM BDL BDL 0.014 BDL BDL 0.008 BDL 7.84
9 26.11.2001 4.00AM BDL BDL BDL BDL BDL 0.004 0.044 1.96
10 26.11.2001 6.00AM BDL BDL 0.01 BDL BDL BDL 0.01 11.76
11 26.11.2001 8.00AM BDL BDL 0.014 BDL BDL 0.02 BDL 7.84
12 26.11.2001 10.20AM BDL BDL 0.016 BDL BDL 0.03 BDL 5.88
13 26.11.2001 12.00NOON BDL 0.002 0.014 BDL BDL 0.026 BDL 11.76
14 26.11.2001 2.30PM BDL BDL BDL BDL BDL 0.026 BDL 7.84
15 26.11.2001 4.00PM BDL 0.003 BDL BDL BDL 0.036 BDL 7.84

 

TABLE 1V C : Control Soil Sample study

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1 27.09.2001 8.35PM BDL 0.004 BDL BDL 0.005 0.106 0.123
2 31.01.2002 9.45AM BDL 0.002 BDL BDL BDL 0.047 BDL

 

TABLE 1V D:Soil Sample Study during immersion

SAMPLE CODE DATE OF COLLECTION TIME OF COLLECTION Cr+6

mg/g

TOTAL Cr

mg/g

Cu

mg/g

Cd

mg/g

Ni

mg/g

Zn

mg/g

Pb

mg/g

1 26.11.2001 2.30PM BDL 0.013 0.038 BDL BDL 0.061 0.018

 

From the above tabulated results the following interpretations may be drawn :

1) The COD values of the samples as compared to their respective controls indicated only little or no significant changes.

2) A part of Kali idol was collected and metal content of the paints on the idol part was analysed. The values obtained indicated presence of significant amount of metals like chromium and lead .

3) The hexavalent and total Chromium , Cadmium, Copper, Nickel, Lead, Zinc content in the digested water samples indicated little or no significant contamination in river water due to idol immersion as compared to their respective controls.

4) The study of the water samples collected a couple of months later from the same spots when the river was almost free from idol immersion activities indicated very little or no significant metal or chemical contamination in the river body. The contamination observed during idol immersion had been carried away during the lapse of time.

5) The soil samples collected from the river bank at the immersion sites a couple of days after the immersion indicated some deposition of metal based material and similar study of the soil samples collected a couple of months later indicated that the deposition had been washed away during the lapse of time.

CONCLUSION: Comparison of the results obtained in this study with the review of water quality objectives, requirements and zoning and classification for Indian water Bodies, published by CPCB, June 2001, indicated that the average chemical and metal contamination due to idol immersion activities in the samples collected from the river Ganga is not a major environmental problem. Though in some isolated cases the values obtained are high enough, as the rivers are open systems, the retention time is very low. Any alteration in water quality or discharge of pollution would thus, not remain at one location for long. As seen in this particular study, the metal content of the parts of idols which is high enough contributed only a little in the water body of the river Ganga and the contamination whatsoever is subsequently carried away in the flow of river.

For other parameters which are being regularly monitored under GAP project, namely pH, BOD, Nitrate, Nitrite and Electrical conductivity etc. have values which indicate that the water body of the river in the vicinity of the idol immersion spots are of excellent to desirable quality. For total and feacal Coliform results however indicate that the river body is not within excellent, desirable or acceptable quality. This is because of anthropogenic and other natural and industrial sources.

The study of the effect of idol immersion in the confined water body also indicated only little or no significant changes.

Human interests and religious sentiments can not be ignored or downgraded in importance and metal and chemical contamination during idol immersion activities in the river and in the confined water body under study is not posing a serious environmental threat as seen in the case study for the last two years.

 

Junior Scientist

Senior Scientist


Home  Consent to Establish  Consent to Operate  Publication of the Board 
Norms Emerging from High Court and Supreme Court  Public Complaint  Regional Offices  Links
West Bengal Pollution Control Board
Paribesh Bhavan, 10A, Block-L.A
Sector III, Salt Lake City, Calcutta - 700 098

Call us at 1-800-345-3390 (toll free)

Please mail uswbpcbnet@wbpcb.gov.in